• Mine Drilling Rig for 30~80m
  • Mine Drilling Rig for 30~80m
  • Mine Drilling Rig for 30~80m
  • Mine Drilling Rig for 30~80m
  • Mine Drilling Rig for 30~80m
  • Mine Drilling Rig for 30~80m

Mine Drilling Rig for 30~80m

After-sales Service: One Year
Warranty: One Year
Certification: CE, SGS , TUV
Condition: New
Motor: AC Motor
Drill Hole Diameter: 100-150mm
Customization:
Diamond Member Since 2019

Suppliers with verified business licenses

Rating: 5.0/5
Henan, China
Importers and Exporters
The supplier has import and export rights
Fast Delivery
The supplier can deliver the goods within 15 days
Customization from Designs
The supplier provides design based customization services
OEM Services
The supplier provides OEM services for popular brands
to see all verified strength labels (8)

Basic Info.

Model NO.
SC-M01
Drill Hole Depth
<100m
Bit Type
Diamond Bit
Drilling Way
Impactor
Transport Package
Wooden Box
Specification
1200x350x600mm
Trademark
Yongchuang
Origin
China
Production Capacity
500set Per Month

Product Description

                                                                    Mine drilling rig for 30~80m 

1. Machine Application 

Hydraulic anchor drilling rigs are mainly used in power stations, highways and railway mountain slopes, anchor cable reinforcement, tunnel pipe shed advance support, foundation pit cable-stayed pile anchor cables, anti-floating anchor rods, ground source heat pump wells, roadbed reinforcement, hydropower engineering Dam foundation and dam body anti-seepage treatment, drainage holes, blast holes in mines and quarries, micro pile holes, etc.

2. Machine Feature  
1. The hydraulic anchor drilling rig adopts a split structure: strong detachability, convenient for elevated construction on slopes, reasonable layout for operations, and remote operation to facilitate efficient construction. At the same time, it is easy to install, move, clean and maintain.
  2. The heat dissipation design of the system, the oil temperature of the system does not exceed 60°C in an environment of 40°C, and it can ensure reliable sealing and stable operation of the system even in harsh high-temperature environments.
  3. A low-speed high-torque motor is used to directly drive the main shaft of the drilling rig without gear transmission to ensure stability and durability, and a wear-resistant plate is used to link with the track to reduce track wear.
  4. Adopt the way of adjusting the air pressure feed to ensure the integrity of the drilling tool during the drilling process in complex formations; when drilling eccentrically with the pipe, it is conducive to eccentric recovery and cost saving.
  5. The main purchased parts of the drilling rig are repeatedly tested by the technical department, and a group of suppliers are selected for long-term fixed cooperation. The company pursues demanding requirements for every production link and production parts to ensure high-quality and stable machine performance.


3. Machine's picture 
Mine Drilling Rig for 30~80mMine Drilling Rig for 30~80mMine Drilling Rig for 30~80mMine Drilling Rig for 30~80mMine Drilling Rig for 30~80mMine Drilling Rig for 30~80mMine Drilling Rig for 30~80mMine Drilling Rig for 30~80m



 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now